Development Overview
The Ichthys Field, in the Browse Basin, is a large scale gas project with gas reserves of approximately 12 TCF and over 500 million barrels of condensate. The Ichthys Development Project will initially produce 8.4 mtpa of LNG, 1.6 mtpa of LPG and approximately 100,000 barrels of condensate per day. The Project is now in the construction phase, following FID in January 2012.
Services Provided
Engineering Management for the offshore Concept Select studies to develop a feasible design for the Development. Study scope included: evaluation of fixed and floating facilities; evaluation of the location and configuration of the facilities; comparison and optimisation of processing options; flow assurance; technical and cost definition of the facilities; preliminary project execution planning.